Pre-Framing History

Ready for Framing – 10/12/24

The Pour: 10-11-23

Pre-pour “isolation framing” of showers, elevator shaft, and sliders – 9/30/23

On-island 9/29-10/4 to celebrate 30 years of love (and pre-pour checking!)

Main Rebar with interior drains installed in trenches – 9/27/23

Underground plumbing trenches refilled and packed – 8/27/23

Sewer lines installed – and passed inspection on 8/2/23

Ariel views of boundary forms in place – 07/27/23

Footings survive passing of Tropical Storm Calvin – 07/19/23

Digging of Footings Starts in Mom’s Room – 7/10/23

Everything looks good from kitchen area – 7/9/23

Pool Area viewed from top of future waterfall – 7/8/23

Front Entranceway Markings – 7/8/23

Footing Areas Marked Out – 7/8/23

Remote Camera goes live 7/7/23

Post Hole Passes Target Depth – 4′ 3″ – 7/6/23

Post Digging Starts for Remote Camera – 7/4/23

Moon sets as sun rises on Independence Day – 7/4/23

Ariel Views – 07/03/23

Sunset from Sabrina’s Future Room – 7/1/23

Dwight checking new boundary survey points – 7/1/23

View from current “house” – 7/1/23

Foundation Prep Completed 6/23/23

Daily Testing Done as put in Structural Fill – everything passes!

Layer 2 Compaction in Mom’s Suite

Structural Fill Compaction Looking Northwest – 6/16/23

Structural Fill Layer 1 Compaction Complete – 6/16/23

Structural Fill Compaction – Layer 1 of 3 – Begins in Mom’s Suite

Structural Fill Starts being added to Mom’s Suite – 6/15/23

Soil Compaction Begins – 6/14/23

6/13/23 – Completion of Topsoil Removal (Ready for Compaction)

6/12/23 – Installation of drainage seepage pit

6/12/23 – Removing topsoil (Prep For Structural Fill)

Week 3 Update – Temp Driveway Prep

Week 3 Update – Lower Side Storm/Gutter Drains (Post-fill)

Week 3 Update – Driveway Center Island Looking Upper Back Corner (Post-fill)

Week 3 Update – Driveway Center Island Looking Upper Back Corner (Pre-fill)

Week 3 Update – Front House Storm Drains

Week 3 Update – Garage Roadside storm drain

Week 3 Update – Landscaping pipes under front of driveway (water + spare)

Week 3 – Landscape irrigation into center of driveway island

Week 3 Update – Landscape Electrical to Center of Island

Week 3 Update – Landscape Electrical Under Front of Driveway Parking Area

June 1, 2023 : Building Permits issued

Day 6 – Installing 4″ PVC Sleeves under future driveway

IGE Testing of Existing Soil Confirms Previous Findings – Need New Structural Fill

Week 1 Overhead Views from Lot 35 For Sale Images

Day 5 – ECM submits request for electrical service to Hawaiian Electric

Day 4 – Grading work continues

Day 3 – Signed w/ECM, Inc for electrical service drawings/submission to MECO

Day 2 – Island Geotechnical Engineering Gets Driveway Soil Sample

Day 1 – May 15th, 2023

Land Blessing – 4/29/23